| ........In
pursuance of the order dated 19th January, 2001 of the Orissa
Electricity Regulatory Commission, in case no 17/2000, passed
in exercise of the powers conferred under Sec 26 of the Orissa
Electricity Reform Act, 1995 and in suppression of WESCO Notification
dated 23rd January, 2001 and in accordance with subsisting
contracts with consumers, WESCO do hereby notifies the tariff
rates for retail supply to different categories of consumers
of Electricity in the Licensed area of supply comprising of
Electrical Circles of Burla, Bolangir and Rourkela in the
State of Orissa as per the Schedule of charges appended hereto.
........The Electricity Duty
levied by the Government of Orissa under the Orissa Electricity
(Duty) Act 1961 and any other statutory levy/duty/tax/cess/toll
imposed under any law from time to time shall be charged over
and above the tariff payable by the consumers in accordance
with the law.
........The
rates and charges, as prescribed by this notification shall
come into force with effect from the 1st February,2001 and
all consumption of electricity made on or after 1st February,
2001 shall be charged accordingly, and until then, the rates
prescribed in the earlier notification mentioned above shall
continue to remain in force.
N.D. CHAWLA
Managing Director.
Schedule of Charges
for Retail Supply
1. DOMESTIC AND DOMESTIC BULK SUPPLY
:- This tariff shall be applicable for supply of
power to residential premises for domestic purposes only and
shall include consumers under Kutir Jyoti Programme. This
shall also include supply to multistoried buildings or residential
colonies receiving bulk power at single point for domestic
purposes provided the connected load for non-domestic purposes
does not exceed 10% of the total connected load. In case the
non-domestic load exceeds 10% of the total connected load,
they shall be treated as commercial or General purpose consumers.
i) DOMESTIC :-
The bill of a consumer would be calculated by summation of
the charges mentioned below.
A) Monthly minimum fixed charges :- The monthly
minimum fixed charges shall be the following :-
Rs. 20 per month for the first kW plus Rs. 10 per month for
each additional kW or part thereof of contract demand.
B) Energy charges :- The monthly energy charges
shall be at the following rates on the units consumed.
| First 100 kWh per month |
Paise 140 per kWh. |
| Next 100 kWh per month |
Paise 230 per kWh. |
| Balance kWh per month |
Paise 320 per kWh. |
C) Kutir Jyoti consumers
:
i) Monthly Minimum Fixed Charge - Rs. 30
per month.
ii) Whenever Kutir Jyoti Consumers have got load in excess
of a single point supply, all such consumers shall be metered
and charged at normal domestic tariff.
D) Unmetered supply or defective meter :
In case of unmetered supply or when the meter is defective
the energy consumption shall be assessed and billed by using
a load factor of 20 percent on the contract demand. For this
purpose, the connected load of less than 0.5 kW shall be treated
as 0.5 kW.
E) Rebate : Early payment rebate of Paise
10 per kWh shall be allowed if payment of the bill (excluding
arrears and electricity duty) is made by the due date indicated
in the bill or within a period of 7 (Seven) days from the
date of receiving of the bill.
ii) DOMESTIC BULK SUPPLY :-
The bill of a consumer would be calculated by summation of
the charges mentioned below.
A) Demand charges :- Rs 10 per month per
kW or part thereof of contract demand.
B) Energy charges :- The monthly energy charges
shall be Paise 230 per kWh on the units consumed.
C) Customer charge:- The monthly customer
charge would be Rs 250 per consumer per month.
D) Unmetered supply or defective meter :
In case of unmetered supply or when the meter is defective
the energy consumption shall be assessed and billed by using
a load factor of 20 percent on the contract demand.
E) Rebate :- Early payment rebate of Paise
10 per kWh shall be allowed if payment of the bill (excluding
arrears and electricity duty) is made by the due date indicated
in the bill or within a period of 7 (Seven) days from the
date of receiving of the bill.
2. COMMERCIAL :-This tariff shall be applicable
for supply of power at a single point at HT/LT to premises,
which are used for office, business, commercial or other purposes
not covered under any other category with a contract demand
upto and excluding 110 KVA and where the non-domestic load
exceeds 10 percent of the total connected load.
i) For supply at LT :The bill of a consumer
would be calculated by summation of the charges mentioned
below, as and where applicable.
A) Monthly minimum fixed charges: - Rs 30
per month for first kW of contract demand/ connected load
plus Rs 20 per month for each additional Kw of contract demand/connected
load or part thereof.
B) Energy charges :- The monthly energy charges
shall be at the following rates on the units consumed.
| i) First 100 kWh per month |
Paise 320 per kWh. |
| ii) Next 200 kWh per month |
Paise 410 per kWh. |
| iii) Balance kWh per month |
Paise 450 per kWh. |
C) Unmetered supply or defective
meter : In case of unmetered supply or when the meter
is defective the energy consumption shall be assessed and
billed by using a load factor of 30 percent on the contract
demand. For this purpose, the connected load of less than
0.5 kW shall be treated as 0.5 kW.
D) Rebate : - Same as for Domestic.
ii) For supply at HT : Bill of a consumer
would be calculated by summation of the charges mentioned
below, as and where applicable.
A) Demand charges : - The monthly demand
charges shall be Rs 50 per kW of the contract Demand/connected
load or part thereof.
B) Energy charges : - The monthly energy
charges shall be Paise 300 per kWh on the units consumed.
C) Customer charge : - The monthly customer
charge would be Rs 250 per consumer per month
D ) Rebate :- Same as for Domestic.
3. IRRIGATION PUMPING AND AGRICULTURE :-
This tariff rate shall be applicable to supply of power, at
HT and LT at a single point for pumping of water in lift irrigation,
flow irrigation and for lifting of water exclusively for agricultural
purposes from wells, nallas, streams, rivulets, rivers, ponds,
dug wells.
i) For supply at LT : The bill of a consumer
would be calculated by summation of the charges mentioned
below, as and where applicable.
A) Monthly minimum fixed charges :- Rs 20
per month for first kW of contract demand/ connected load
plus Rs 10 per month for each additional kW of contract demand/
connected load or part thereof.
B) Energy charges :- The monthly energy charges
shall be Paise 110 per kWh on the units consumed.
C) Unmetered supply or defective meter :-
In case of unmetered supply or when the meter is defective
the energy consumption shall be assessed and billed by using
a load factor of 8 percent on the contract demand from June
to October and 15 percent on the contract demand from November
to May.
D) Rebate:- Same as for Domestic.
ii) For supply at HT : The bill of a consumer
would be calculated by summation of the charges below, as
and where applicable.
A) Demand charges :- The monthly demand charges
shall be Rs 30 per kW of contract demand/connected load or
part thereof.
B) Energy charges : - The monthly energy
charges shall be Paise 100 per kWh on the units consumed.
C) Unmetered supply or defective meter :-
Same as i) (C) above.
D) Customer charge : The monthly customer
charge would be Rs 250 per consumer per month.
E) Rebate : - Same as for Domestic.
4. STREET LIGHTING : - This tariff shall
be applicable for consumption of power for street lighting
by local authority or public body at a single point supplied
at LT.
The bill of a consumer would be calculated by summation of
the charges mentioned below, as and where applicable.
A) Monthly minimum fixed charges :- Rs 20
per month for first kW of contract demand/ connected load
plus Rs 10 per month for each additional kW of contract demand/
connected load or part thereof.
B) Energy charges : - The monthly energy
charges shall be Paise 320 per kWh on the units consumed.
C) Rebate : - Prompt payment Rebate at the
rate of 1% (1percentage) of the amount of the monthly bill
excluding arrears and electricity duty will be allowed for
payment made within 48 hours of presentation of the bill.
D) Delayed payment surcharge :- The monthly
charges as calculated above together with other charges and
surcharges on account of delayed payments, If payment is not
made within the due date, delayed payment surcharge shall
be charged for every day delay at 2 (two) percent per month
on the amount remaining unpaid (excluding arrears on account
of delayed payment surcharge).
5. SMALL INDUSTRY :- This tariff rate shall
be applicable to supply of power at a single point for industrial
production purposes with contract demand/connected load upto
but excluding 22KVA where power is generally utilised as a
motive force and supplied at LT. The bill of a consumer would
be calculated by summation of the charges mentioned below
as and where applicable.
A) Monthly minimum fixed charges :- Rs 40
per month for first kW of contract demand/ connected load
plus Rs 30 per month for each additional kW of contract demand/
connected load or part thereof.
B) Energy charges :- The monthly energy charges
shall be Paise 320 per kWh on the units consumed.
C) Unmetered supply or defective meter :-
In case of unmetered supply or when the meter is defective
the energy consumption shall be assessed and billed by using
a load factor of 15 percent on the contract demand.
D) Rebate : - Same as for Domestic.
6. MEDIUM INDUSTRY :- This tariff shall be
applicable to supply of power at a single point for industrial
production purposes with a contract demand/connected load
of 22 KVA and above upto but excluding 110 KVA where power
is generally utilised as a motive force.
i) For supply at LT : The bill of a consumer
would be calculated by summation of the charges mentioned
below, as and where applicable.
A) Monthly minimum fixed charges :- Rs 80
per month for first kW of contract demand/ connected load
plus Rs 50 per month for each additional kW of contract demand/connected
load or part thereof.
B) Energy charges : - The monthly energy
charges shall be paise 320 per kWh on the units consumed.
C) Rebate :- Same as for Street Lighting.
D) Delayed payment surcharge :- Same as for
Street Lighting.
ii) For supply at HT : The bill of a consumer
would be calculated by summation of the charges mentioned
below, as and where applicable.
A) Demand charges :- The monthly demand charges
shall be Rs 50 per kW of contract demand/connectioned load
or part thereof.
B) Energy charges :- The monthly energy charges
shall be Paise 300 per kWh on the units consumed.
C) Customer charge : The monthly customer
charge would be Rs 250 per consumer per month.
D) Rebate : - Same as for Street Lighting.
E) Delayed payment surcharge :- Same as for
Street Lighting.
F) Penalty for overdrawal :- If the maximum
demand recorded in a month exceeds the contract demand, a
penalty at the rate for demand charges for the maximum demand
in excess of contract demand shall be added.
7. PUBLIC WATER WORKS AND SEWERAGE PUMPING:-
This tariff shall be applicable to supply of power for public
water supply and sewerage, pumping installations, owned and
operated by the state government, local bodies or their agencies,
at a single point of supply.
i) For installation with contract demand of 110 KVA and above.
The bill of a consumer would be calculated by summation of
the charges mentioned below, as and where applicable
A) Demand charges :- The monthly demand charges
shall be at Rs 200/- per KVA of maximum demand or 80% of the
contract demand which ever is higher.
B) Energy charges :- The monthly energy charges
for all units consumed shall be at the following rates.
| i) For supply at HT, |
paise 300 per Kwh. |
| ii) For supply at LT |
paise 320 per Kwh. |
Power Factor Incentive :-
Incentive for maintenance of higher power factor shall be
at the rate of 0.5% for every 1% rise above 97% upto and including
100% on the monthly demand charges and energy charges.
C) Power factor penalty :- The monthly demand
charges and the monthly energy charges. shall be increased
in the following manner when the average power factor during
a month falls below 90 percent.
i) By 0.5 percent for every 1 (one) percent fall below 90
percent upto and including 60 percent. plus
ii) 1 (one) percent for every 1 (one) percent fall below 60
percent upto and including 30 percent. plus
iii) 2 (two) percent for every 1 (one) percent fall below
30 percent.
E) Penalty for overdrawal :- If the maximum
demand recorded in a month exceeds the contract demand, a
penalty at the rate for demand charges for the maximum demand
in excess of contract demand shall be added for supply at
LT.
For supply at HT/ EHT:- The same as per Large Industry
F) Customer charge :- The monthly customer
charge would be as follows:-
(i) For supply at HT, Rs 250 per consumer per month.
(ii) For supply at LT, Rs 30 per consumer per month.
G) Rebate :- Same as for Street Lighting.
H) Delayed payment surcharge :- Same as for
Street Lighting.
ii) For installations with contract demand upto but not including
110KVA. The bill of a consumer would be calculated by summation
of the charges mentioned below, as and where applicable.
A) Monthly minimum fixed charges :- Rs 80
per month for first kW of contract demand/ connected load
plus Rs 50 per month for each additional kW of contract demand/
connected load or part thereof.
B) Energy charges :- The monthly energy charges
shall be at the following rates on the units consumed.
(i) Paise 300 per kWh for supply at HT.
(ii) Paise 320 per kWh for supply at LT.
C) Rebate:- Same as for Street Lighting.
D) Delayed payment surcharge :- Same as for
Street Lighting.
8. PUBLIC INSTITUTIONS:- This tariff shall
be applicable for power supply at a single point at HT/EHT
to educational institutions including hostels, government
hospitals, government dispensaries, primary health centres,
charitable dispensaries, religious institutions, dharamsala,
electric crematoriums and non commercial sports organisations.
i) For supply at LT : The bill of a consumer
would be calculated by summation of the charges mentioned
below, as and where applicable.
A) Monthly minimum fixed charges :- Rs 80
per month for first kW of contract demand/ connected load
plus Rs 50 per month for each additional kW of contract demand/connected
load or part thereof.
B) Energy charges :- The monthly energy charges
shall be paise 320 per kWh on the units consumed.
C) Rebate :- Same as for Street Lighting.
D) Delayed payment surcharge :- Same as for
Street Lighting.
ii) For supply at HT : The bill of a consumer
would be calculated by summation of the charges mentioned
below, as and where applicable.
A) Demand charges :- The monthly demand charges
shall be Rs 50 per kW of contract demand/connected load or
part thereof.
B) Energy charges :- The monthly energy charges
shall be Paise 300 per kWh on the units consumed.
C) Power Factor Incentive :- Incentive for
maintenance of higher power factor shall be at the rate of
0.5% for every 1% rise above 97% upto and including 100% on
the monthly demand charges and energy charges.
This provision will be applicable to consumers with contract
demand of 110 KVA and above.
D) Power factor penalty :- The monthly demand
charges and the monthly energy charges. shall be increased
in the following manner when the average power factor during
a month falls below 90 percent.
i) By 0.5 percent for every 1 (one) percent fall below 90
percent upto and including 60 percent. plus
ii) 1 (one) percent for every 1 (one) percent fall below 60
percent upto and including 30 percent. plus
iii) 2 (two) percent for every 1 (one) percent fall below
30 percent.
This provision will be applicable to consumers with contract
demand of 110 KVA and above.
E) Customer charge: The monthly customer
charge would be Rs 250 per consumer per month.
F) Rebate:- Same as for Street Lighting.
G) Delayed payment surcharge :- Same as for
Street Lighting.
9. GENERAL PURPOSE SUPPLY:- This tariff shall
be applicable for supply of power for all general purposes
comprising a mixed load and with a contract demand of 110
KVA and above where the non-domestic load exceeds 10% of the
total connected load.
The bill of a consumer would be calculated by summation of
the charges mentioned below as and where applicable.
A) Demand charges :- The monthly demand charges
shall be Rs 200/- per KVA of maximum demand or 80% of the
contract demand which ever is higher.
B) Energy charges :- The monthly energy charges,
for all units consumed, shall be at the following rates.
(i) For supply at LT : Paise 320 per kWh
for all consumption.
(ii) For Supply at HT : Paise 300 per Kwh.
(iii) For supply at EHT :- Paise 290 per
Kwh.
C) Incentive for Higher Consumption :
i) Incentive shall be available to those consumers who will
not reduce their contract demand during the next three financial
years
ii) For the purpose of determination of eligibility for incentive
tariff percentage of consumption shall be with reference to
contract demand or the maximum demand which ever is higher
(e.g. CD or MD x PF x number of hours in a month)
iii) The ratio of the total number of units consumed during
a given period to the total number of units that would have
been consumed had the contract demand or the maximum demand
whichever is higher was maintained through out the same period
as indicated above, exceeds 50%, of the total consumption
the consumer will be entitled to get the benefit of incentive.
iv) Different rates of Energy Charges in excess of the ratio
mentioned above is shown below
| |
HT |
EHT |
| Consumption upto 50% |
300 p/u |
290 p/u |
| >50% = <60% |
200 p/u |
180 p/u |
| >60% |
170 p/u |
150 p/u |
v) Demand Charges as applicable would be
chargeable in addition to the above.
I) EHT Consumer
a) Consumption in a month calculated on the basis of the contract
demand or maximum demand whichever is higher upto 50% shall
be payable@290 paise /unit for consumers availing power at
EHT.
b) In addition to the above all consumption in excess of 50%
but upto and including 60% shall be payable @ 180paise/unit
for consumers availing power at EHT.
c) When the consumption exceeds 60% in a month all such excess
consumption shall be payable @ 150 paise/unit for consumers
availing power at EHT in addition to the charges indicated
at para b).
II) HT Consumers
a) Consumption upto 50% shall be payable @300 paise /unit
for consumers availing power at HT.
b) In addition to the above all consumption in excess of 50%
but upto and including 60% shall be payable @ 200 paise/unit
for consumers availing power at HT.
c) When the consumption exceeds 60% in a month all such excess
consumption shall be payable @ 170 paise/unit for consumers
availing power at HT in addition to the charges indicated
at para b)above.
D) Power Factor Incentive :- Incentive for
maintenance of higher power factor shall be at the rate of
0.5% for every 1% rise above 97% upto and including 100% on
the monthly demand charges and energy charges.
E) Power factor penalty :- The monthly demand
charges and the monthly energy charges. shall be increased
in the following manner when the average power factor during
a month falls below 90 percent.
i) By 0.5 percent for every 1 (one) percent fall below 90
percent upto and including 60 percent. plus
ii) 1 (one) percent for every 1 (one) percent fall below 60
percent upto and including 30 percent. plus
iii) 2 (two) percent for every 1 (one) percent fall below
30 percent.
F) Penalty for overdrawal :- The penalty
for overdrawal shall be as detailed below :-
i) For supply at EHT/HT the following shall apply:
a) During 0700 hours to 1000 hours and during 1800 hours to
2200 hours( together called the peak hours), if the maximum
demand recorded in a month exceeds the contract demand, a
penalty at the rate for demand charges for the maximum demand
in excess of contract demand shall be added.
b) During 1000 hours to 1800 hours and during 2200 hours to
0700 hours (together called the off-peak hours) the following
shall apply in addition to para a above:-
1. For maximum demand recorded during off peak hours in a
month 120% of the contract demand, no penalty would be levied.
2. If the maximum demand recorded during off peak hours in
a month is higher than 120% of the contract demand, then a
penalty at the rate of demand charge on the differential of
maximum demand recorded during off peak hours 120% of the
contract demand charges shall be added.
ii) For supply at LT, if the maximum demand recorded in a
month exceeds the contract demand, a penalty at the rate for
demand charges for the maximum demand in excess of contract
demand shall be added.
G) Customer charge:- The monthly customer charge would be
as follows:
i) For supply at EHT, Rs 700 per consumer per month.
ii) For supply at HT, Rs 250 per consumer per month.
iii) For supply at LT, Rs 30 per consumer per month.
H) Rebate:- Same as for Street Lighting.
I) Delayed payment surcharge Same as for Street Lighting.
10. LARGE INDUSTRY:- This tariff shall be
applicable for supply of power, at one point of supply, for
industries with a contract demand of 110 KVA and above upto
and substantially utilised as a motive force for industrial
production. The bill of a consumer would be calculated by
summation of the charges mentioned below, as and where applicable.
A) Demand charges: - The monthly demand charges
shall be at Rs 200/- per KVA of recorded maximum demand or
80% of the contract demand which ever is higher.
B) Energy charges :- The monthly energy charges,
for all units consumed except colony consumption , shall be
at the following rates.
(i) For supply at LT : Paise 320 per kWh
for all consumption.
(ii) For Supply at HT : Paise 300 per Kwh.
(iii) For supply at EHT :- Paise 290 per
Kwh.
C) Incentive for Higher Consumption: Same
as for General Purpose.
D) Colony consumption :- The units consumed
for the colony shall be separately metered. Such energy consumption
upto maximum of 10 percent of the total consumption shall
be deducted from the main meter reading and billed at the
flat rate of 230 Paise per kWh. Energy consumed in colony
in excess of 10% of the total consumption shall be billed
at energy charges specified in B) above.
E) Power Factor Incentive:- Incentive for
maintenance of higher power factor shall be at the rate of
0.5% for every 1% rise above 97% upto and including 100% on
the monthly demand charges and energy charges.
F) Power factor penalty :- The monthly demand
charges and the monthly energy charges shall be increased
in the following manner when the average power factor during
a month falls below 90 percent.
i) By 0.5 percent for every 1 (one) percent fall below 90
percent upto and including 60 percent. plus
ii) 1 (one) percent for every 1 (one) percent fall below 60
percent upto and including 30 percent. plus
iii) 2 (two) percent for every 1 (one) percent fall below
30 percent.
G) Penalty for overdrawal :- The penalty
for overdrawal shall be as detailed below :-
i) For supply at EHT/HT the following shall apply:
a) During 0700 hours to 1000 hours and during 1800 hours to
2200 hours( together called the peak hours), if the maximum
demand recorded in a month exceeds the contract demand, a
penalty at the rate for demand charges for the maximum demand
in excess of contract demand shall be added.
b) During 1000 hours to 1800 hours and during 2200 hours to
0700 hours (together called the off-peak hours) the following
shall apply in addition to para a above:-
1. For maximum demand recorded during off peak hours in a
month 120% of the contract demand, no penalty would be levied.
2. If the maximum demand recorded during off peak hours in
a month is higher than 120% of the contract demand, then a
penalty at the rate of demand charge on the differential of
maximum demand recorded during off peak hours 120% of the
contract demand charges shall be added.
ii) For supply at LT, if the maximum demand recorded in a
month exceeds the contract demand, a penalty at the rate for
demand charges for the maximum demand in excess of contract
demand shall be added.
H) Customer charge:- The monthly customer
charge would be as follows:- (Not applicable for Colony Consumption)
i) For supply at EHT, Rs 700 per consumer per month.
ii) For supply at HT, Rs 250 per consumer per month.
iii) For supply at LT, Rs 30 per consumer per month.
I) Rebate :- Prompt payment Rebate at the
rate of 1% ( one percentage) of the amount of the monthly
bill excluding arrears and electricity duty will be allowed
for payment made within 48 (Forty Eight) hours of presentation
of the bill.
J) Delayed payment surcharge :- The monthly
charges as calculated above together with other charges and
surcharges on account of delayed payments, If payment is not
made within the due date, delayed payment surcharge shall
be charged for every day delay at 2 (two) percent per month
on the amount remaining unpaid (excluding arrears on account
of delayed payment surcharge).
11. POWER INTENSIVE INDUSTRY :-This tariff
is applicable to industries, where power is substantially
utilised as raw material involving electro - chemical or electro-metallurgical
processes, having a contract demand of and above 2000 KVA.
The bill of a consumer would be calculated by summation of
the charges mentioned below as and where applicable.
A) Demand charges :- The monthly demand charges
shall be at Rs 200/- per KVA of maximum demand or 80% of the
contract demand which ever is higher.
B) Energy charges :-. The monthly energy
charges, for all units consumed except colony consumption,
as mentioned under large industry shall be at the following
rates.
i) For supply at EHT - Same as under Large
Industry. ii) For supply at HT - Same as under Large Industry.
C) Incentive for Higher Consumption : - Same
as for General Purpose.
D) Colony consumption :- Same as for Large
Industry
E) Power Factor Incentive:- Same as for Large
Industry
F) Power factor penalty :- . Same as for
Large Industry
G) Penalty for overdrawal :- Same as for
Large Industry
H) Customer charge :- The monthly customer
charge would be as follows :-( Not applicable for Colony Consumption)
i) For supply at EHT Rs. 700 per consumer per month. ii) For
supply at HT Rs. 250 per consumer per month
I ) Rebate :-Same as for Large Industry
J) Delayed payment surcharge :- Same as for
Large Industry
12. HEAVY INDUSTRY:-This tariff shall be
applicable to Industries with a contract demand of 25000 kVA
and above supplied at EHT, where power is substantially utilised
as a motive force.
The bill of a consumer would be calculated by summation of
the charges mentioned below as and where applicable.
A) Demand charges :- The monthly demand charges
shall be at Rs 200/- per KVA of maximum demand or 80% of the
contract demand which ever is higher.
B) Energy charges :- The monthly energy charges,
except for colony consumption as
mentioned under large industry :
Same as B(iii) under large industry
C) Incentive for Higher Consumption : Same
as for Large Industry
D) Colony consumption :- Same as for Large
Industry
E) Power Factor Incentive:- Same as for Large
Industry
F) Power factor penalty :-.Same as for Large
Industry
G) Penalty for overdrawal :-Same as for Large
Industry
H) Customer charge :- The monthly customer
charge would be Rs.700 per consumer per month.
(Not applicable for Colony Consumption)
I) Rebate :- Same as for Large Industry
J) Delayed payment surcharge :- Same as for
Large Industry
13. RAILWAY TRACTION:- This tariff shall
be applicable for supply of power to railway traction at single
point of supply at EHT/HT.
The bill of a consumer would be calculated by summation of
the charges incentives mentioned below, as and where applicable.
A) Demand charges :- The monthly demand charges
shall be at Rs 200/- per KVA of maximum demand or 80% of the
contract demand which ever is higher.
B) Energy charges :- The monthly energy charges
for all units consumed shall be at the following rates.
i) For supply at EHT : Same as B(iii) under
large industry
ii) For supply at HT : Same as B(ii) under
large industry
C) Incentive for Higher Consumption : Same
as for Large Industry.
D) Power Factor Incentive :- Same as for
Large Industry.
E) Power factor penalty :- Same as for Large
Industry.
F) Penalty for overdrawal :- Same as for
large industry.
G) Customer charge:- The monthly customer
charge would be as follows:-
i) For supply at EHT, Rs 700 per consumer per month.
. ii) For supply at HT, Rs 250 per consumer per month.
H) Rebate :- Same as for Large Industry.
I) Delayed payment surcharge :- Same as for
Large Industry.
14. MINI STEEL PLANT:-This tariff shall be
applicable for supply of power at EHT/HT to steel manufacturing
units licensed to operate as mini Steel Plant with contract
demand of 4444 KVA and above where power is ordinarily utilised
in Induction or Arc Furnaces.
The bill of a consumer would be calculated by summation of
the charges mentioned below as and where applicable.
A) Demand charges :- The monthly demand charges
shall be at Rs 200/- per KVA of maximum demand or 80% of the
contract demand whichever is higher.
B) Energy charges :- The monthly energy charges,
for all units consumed except colony consumption as mentioned)
under Large Industry, shall be at the following rates .
(i) For supply at EHT. Same as for Large
Industry para B (iii)
(ii) For supply at HT. Same as for Large
Industry para B (ii)
C) Incentive for Higher Consumption : Same
as for Large Industry.
D) Colony consumption :- Same as for Large
Industry
E) Power Factor Incentive :- Same as for
Large Industry
F) Power factor penalty :- Same as for Large
Industry
G) Penalty for overdrawal :- Same as for
Large Industry
H) Customer charge :- The monthly customer
charge would be as follows :- (Not applicable for Colony Consumption)
i) For supply at EHT, Rs. 700 per consumer per month.
ii) For supply HT, Rs. 250 per consumer per month.
I) Rebate:- Same as for Large Industry
J) Delayed payment surcharge :- Same as for
Large Industry
15. EMERGENCY POWER SUPPLY TO CAPTIVE POWER PLANTS
(C.P.P):- This tariff rate shall be applicable to
supply for emergency assistance to the Captive power Plants
in the state for start-up of units or to meet their essential
auxiliary and survival requirement in the event of the failure
of the C.P.P . The bill of a consumer would be calculated
by summation of the charges mentioned below as and where applicable.
A) Energy charges :- The monthly energy charges
shall be paise 380 per Kwh on the units consumed.
B) Power Factor Incentive :- Same as for
Large Industry
C) Power factor penalty :- Same as for Large
Industry
D) Customer charge :- The monthly customer
charge would be Rs. 700 per consumer per month.
E) Rebate:-. Same as for Large Industry
F) Delayed payment surcharge :- Same as for
Large Industry
16. DIRECT CURRENT SERVICES: This tariff
shall be applicable for Direct Current (D.C) power supplied
to domestic, commercial and small industry categories of consumers.
A) Domestic :- The monthly charges shall
be calculated at the rate as applicable to A.C as mentioned
under Domestic category along with other terms and conditions
as mentioned therein.
B) Commercial : The monthly charges shall
be calculated at the rate as applicable to A.C. as mentioned
under Commercial category along with other terms and conditions
as mentioned therein.
C) Small Industry :- The monthly charges
shall be calculated at the rate as applicable to A.C as mentioned
under small industry category along with other terms and conditions
as mentioned therein.
17. SPECIAL TARIFF FOR INDUSTRIES WITH CONTRACT DEMAND
OF 100 MVA AND ABOVE:- Industries with contract demand
of 100MVA and above and maintaining a guaranteed monthly load
factor of 80% will not pay monthly demand charge and shall
pay only a consolidated energy charge at a rate of paise 200
per Kwh. In case the maximum demand exceeds the contracted
capacity, demand charge as applicable to the relevant consumer
category will be payable only on the maximum demand in excess
of the contract demand.
18. MISCELLANEOUS CHARGES : Charges, other
than and in addition to the charges mentioned in the tariff
schedule shall be leviable for the purpose and in the manner
specified below:-
A) Monthly Meter Rent (including associated equipment) B)
Reconnection charges
| Sl.No |
Type |
Charges |
Type |
Charges |
| 1. |
Single phase electro-magnetic kWh. Meter |
Rs. 15 |
Single phase domestic consumers |
Rs 30 |
| 2. |
Three phase electro-magnetic kWh. Meter |
Rs. 30 |
Single phase other consumers |
Rs 50 |
| 3. |
Three phase electro-magnetic Trivector
Meter |
Rs. 800 |
Three phase LT consumers |
Rs 100 |
| 4. |
Trivector Meter for Railway Traction |
Rs. 800 |
EHT & HT consumers |
Rs 500 |
| 5. |
Single phase static kWh. Meter |
Rs 35 |
|
|
| 6. |
Three phase static kWh. Meter |
Rs 100 |
|
|
| 7. |
Three phase static Trivector Meter |
Rs 800 |
|
|
| 8. |
Three phase static Bivector Meter |
Rs. 800 |
|
|
A) New connection charges for LT
:- For new service connections upto and including
3 kw load, there will be a flat charge of Rs 500 per consumer.
The existing practice of preparation of estimate and payment
of charge based on the estimated amount shall continue without
any change for connections above 3 kw load.
D) Fuel Surcharge Adjustment Formula :- Fuel
surcharge adjustment charges as calculated under the formula,
prescribed by OERC for Distribution Licensees shall continue,
from all consumers.
E) Rounding off a consumer's billed amount to nearest
rupee :-Rounding off a consumer's billed amount shall
be done to the nearest rupee.
The money actually collected should be receipted and accounted
for.
F) Temporary connection charges:- The tariff
for the period of temporary connection shall be at the rate
applicable to the relevant consumer category.
G) Metering on L.T. side of Consumer's Transformer
:- When metering is done at LT side of consumer's
transformer, the computed transformer losses shall be added
to the reading of the meter both for energy and for demand
to arrive at the energy and demand for billing purposes in
the following manner as and where applicable:-
(i) Energy loss in transformer (kWh per month) = (730/100)
× KVA rating of transformer.
Energy for billing purposes = Recorded energy + Energy loss
in transformer
(ii) Loss in demand = One percent of the rating of transformer
in KVA.
Maximum Demand for billing purposes = (Recorded maximum demand
in KVA) + (0.01 × KVA rating of transformer).
|